Headway Diagnóstico — measured baseline and sized opportunity
Measures the baseline on data the client already has, sizes the opportunity with explicit assumptions, and delivers the business case that supports — or kills — the pilot.
Context
A diagnostic exists to answer three questions in the right order: where the money is, how much of it is reachable within one contract horizon, and what has to be true to get there. None of them is answered by market benchmarks — all require the operation’s own data.
The work starts by mapping what exists: work orders, inspection records, speed restrictions, workshop history, telemetry, scheduling spreadsheets. The data is almost always scattered and incomplete, and the first deliverable is a precise statement of what can and cannot be measured today — which is valuable on its own.
From there the baseline is built: the numerical picture of current performance, with source, period and scope declared. Any later gain is measured against it. Without a baseline agreed in writing, a gain is not a gain — it is an opinion with decimal places.
The diagnostic is always paid. It is where the most expensive technical effort goes and where the credibility of the number supporting everything else is established. Free work signals low value and finances the sale from the seller’s own cash.
What you get
What you get
Available data map
Inventory of existing sources — ERP/EAM, inspection cars, non-destructive testing, telemetry, field records — with what each one supports today and what it does not yet support.
Measured baseline
Numerical picture of current performance by segment or asset family, with source, period and measurement scope declared alongside every indicator.
Sized opportunity
Reachable gain range with the assumption in the open: what the estimate assumes, what supports it and what would break it. No range without a baseline.
Formal business case
Investment, expected gain, time to first value and sensitivity to critical assumptions — in the format an investment committee accepts.
Pilot design
Proposed perimeter, success criteria, measurement indicators and the rule the contract must fix before work starts.
When this applies
Situations in which this line of work is the right starting point.
- A large maintenance budget with no reliable reading of how much of it is misallocated.
- The committee asks for numbers and what exists are vendor estimates.
- Recurring speed restrictions or fleet availability below plan, with no consolidated root cause.
- The client wants to test the thesis before committing capital and team capacity.
FAQ
Frequently asked questions
Why is the diagnostic not free?
Because it is the most expensive phase in technical effort — integration and calibration engineering — and where the credibility of the baseline is built. Part of the fee is credited against the pilot contract, but the phase is never zeroed.
What if the diagnostic says it is not worth it?
That is a legitimate outcome and it is expected. The internal cut-off is explicit: a project without a clear thesis does not become a proposal.
How much data is needed to start?
Less than people assume. The diagnostic is designed for operations with scattered, incomplete data — mapping the gap is part of the delivery. What cannot be worked around is a complete absence of intervention history.
Related services
Track maintenance optimisation
Ranks inspection, tamping, grinding and component renewal by risk and operational criticality, within the budget and the windows the operation actually has.
See service 03Rolling stock optimisation
Treats the fleet as a system: prioritises critical components, sequences the workshop by effect on availability and sizes the spare parts stock that sustains the plan.
See service 04Bulk terminal optimisation
Treats the terminal as the series line it is: critical equipment ranked by throughput impact, with the intervention window matched to the vessel line-up and train arrivals.
See serviceNext step
How much of your maintenance budget is well allocated?
The conversation starts with the problem, not the platform: which decision is made today without enough data, and what the order of magnitude would be if it improved. Thirty minutes, no corporate deck.